05.18.09
Double damn!
I got the G&T socks back on track and they are going along nicely. One complete repeat on both socks completed and into the second repeat. Decided on plastic tapestry needles for the cable needles and it’s going well with that too.
So this morning I get out the computer, Excel and the graph for the purple sweater to start charting the bindoffs vs the lace pattern so I can work on that today. Then I go to see where the front neck starts doing it’s thing so I can incorporate that into the chart too. Yeah… The armholes start at 15″ from the beginning. The front neck decreases start at 11.5″.
Now I have to think about whether I wanna
- rip out some of the sweater (ugh!)
OR
- hope I have enough yarn to start the neckline decreases now and just make it a bit longer (it was short in the first place and I DID get extra yarn so I’d be able to do longer sleeves, so I’d probably be okay there, but then probably have to stick to the shorter sleeves)
OR
- rip a bit but not all the way back to 11.5″and hope that I’ll have a little more length but still enough for long sleeves.
Decisions, decisions